← Back to Projects Gallery

Addressing the subsidence of a residential villa

📍 Location Dammam
⚙️ Structural Service Landslide treatment
🛠️ Engineering Solution Soil injection
01

Detected Problem

Cracks appeared and there was a slight subsidence.

02

Executed Engineering Solution

Injecting soil beneath the foundations.

03

Final Result & Evaluation

Improve stability and reduce slump.

Execution Plan

Execution Stages & Steps on Site

We follow strict, methodical engineering procedures that ensure speed and precision without risking structural integrity.

01

Site inspection and problem detection

Determining the dimensions of the subsidence and crack paths, and installing monitoring indicators to assess the structural condition.

02

Excavation and soil testing

Make small, deep access holes under the foundations for actual diagnosis to determine the condition of the soil.

03

Soil injection and stabilization below the foundations

Pumping chemical cementitious reinforcement materials under rated pressure to strengthen damaged soil.

04

Technical monitoring and acceptance

Checking the integrity of the foundations and the levelness of the floors and delivering a comprehensive explanatory report to the client.

Notice subsidence or cracks in your structure?

Don't wait for the problem to worsen and threaten your building's safety. Contact Hamat United engineers now for expert consultation and site inspection.